NM Bath Upgrades
Complete Bathroom Renovation

Full Bathroom Remodel in Aberdeen, SD

When a patch job won't cut it, NM Bath Upgrades handles everything — design consultation, material selection, demo, plumbing, electrical, tile, fixtures, and finishing. One crew. One contract. One bathroom done right.

Request a Free Estimate

What a Full Remodel Includes

A complete gut-to-finish renovation means nothing carries over from the old bathroom unless you want it to.

Demo & Removal

We strip the bathroom to the studs — removing existing tile, fixtures, vanity, flooring, and drywall. Any water damage, mold, or subfloor rot discovered during demo is addressed before anything new goes in.

Plumbing & Electrical

Rough-in plumbing relocated or updated to match your new layout. Electrical updated for GFCI compliance, new lighting, and exhaust fan placement. We coordinate inspections when required by the scope of work.

Waterproofing & Backer

Cement board and membrane waterproofing on all wet surfaces before a single tile goes up. KERDI or comparable shower waterproofing systems used in shower and tub surrounds — not household plastic sheeting.

Custom Tile Work

Floor tile, shower surround, accent borders, and niches in your choice of ceramic, porcelain, natural stone, or Onyx collection panels. We handle layout planning, cutting, setting, grouting, and sealing.

Fixtures & Vanity

Toilet, vanity, sink, faucets, shower valve, showerhead, towel bars, and all trim work selected with you during design consultation and installed by the same crew doing the tile and plumbing.

Finishing Work

Drywall, paint, trim, door hardware, mirror, and lighting — every finish detail completed before we call the job done. You won't be scheduling a second contractor to finish what we started.

Materials & Design Options

We work with materials built to last — not the cheapest options that look good in photos and fail in two years.

Onyx Collection Panels

Solid surface shower and tub panels with no grout lines to maintain. Onyx panels are non-porous, mold-resistant, and available in dozens of patterns and colors — a premium option for homeowners who want a clean, low-maintenance surround.

KERDI Waterproofing

Schluter KERDI is the commercial-grade waterproofing membrane used in high-end hotel bathrooms. We install it as the foundation for all tiled shower and tub surrounds — not as an upgrade, but as standard practice.

Custom Tile Selection

Ceramic, porcelain, natural stone, glass mosaic — we help you select tile that works with your budget, your maintenance preferences, and your aesthetic. We'll advise against choices that look great in a showroom but fail in real bathrooms.

Fixture Brands

We source fixtures from Moen, Delta, Kohler, and comparable manufacturers — brands with real parts availability and warranty support. We'll help you match finish and style across all fixtures for a cohesive result.

Timeline & Process

Most full bathroom remodels complete in 1–2 weeks. Here is how the project unfolds.

1

Design & Estimate

We walk the existing bathroom, discuss your goals, and work through material selections together. You receive a written estimate covering every line item — labor, materials, and any structural work. No hidden additions at the end.

2

Demo Day

Everything comes out. Tile, fixtures, vanity, flooring, drywall. Any water damage or structural issues discovered during demo are photographed and reviewed with you before we proceed. Your project budget doesn't change without your sign-off.

3

Rough Work

Plumbing rough-in, electrical updates, cement board or KERDI waterproofing, and any structural framing. This is the work that goes inside the walls and under the floor — done right, it protects everything built on top of it.

4

Tile & Fixtures

Floor tile set and grouted. Shower or tub surround tiled, grouted, and sealed. Vanity, toilet, sink, faucets, and shower hardware installed and leak-tested. Lighting, mirrors, and trim completed.

5

Final Walkthrough

We walk every inch of the finished bathroom with you before calling the job complete. Any punch list items are addressed on the spot. You should not need to call us back for something we should have caught.

Full Remodel vs. Partial Updates

When homeowners choose a full remodel:

  • The layout no longer works. A partial update can't move a toilet or relocate a shower — only a full remodel lets you redesign for function, not just appearance.
  • Water damage is present. Replacing tile over rotted subfloor or mold-damaged drywall is a repair that will need redoing in two years. A full remodel fixes the underlying problem.
  • Everything is aging at once. When the tile, vanity, toilet, and tub are all 25 years old, a coordinated full replacement costs less than piecemeal updates over five years.
  • Resale is the goal. Buyers in the Aberdeen market respond to fully renovated bathrooms. A partial refresh with dated tile still reads as a dated bathroom.
  • It's the highest-ticket renovation for ROI. A complete bathroom remodel consistently returns the highest percentage of cost at resale of any home improvement category.

NM Construction's Approach

Licensed, insured, and backed by a 2-year workmanship warranty.

A full bathroom remodel involves six or seven distinct trades — demo, plumbing, electrical, tile, carpentry, painting, and fixture installation. Most contractors manage this by subcontracting pieces to whoever is available, leaving the homeowner to coordinate between crews with no single person accountable for the result. We don't work that way.

NM Construction is the general contractor and the crew. When something needs to be corrected, you call one number. When the 2-year warranty applies, you call one number. We've been in Aberdeen long enough that our reputation is worth protecting — and we're not going anywhere after the job is done.

Licensed & Insured
2-Year Workmanship Warranty
Typical Timeline: 1–2 Weeks
Free, Upfront Estimates

Ready to Transform Your Bathroom?

Get a free, no-obligation estimate for your full bathroom remodel in Aberdeen, SD.

Request a Free Estimate